Hogarths Hotel in Solihull required a complete refurbishment of the existing marquee structure they were using for weddings and events. Following a thorough inspection, we formulated a plan to replace some parts of the structure and totally update the interior décor and fittings.
Refurbishment of the marquee at Hogarths Hotel, Solihull was a comprehensive and detailed project which entailed a lot of planning and only the original frame was left intact. The original roof was removed and replaced with a double-skinned PVC cover to eliminate condensation, and the flooring was replaced with a hard-wearing, attractive vinyl floor.
One of the long sides was covered with an attractive wall panelling, finished throughout with a matching wooden pelmet and boxed in legs.
Three types of doors were fitted to the structure, pedestrian access doors with an aluminium ramp, sliding doors for car access when events require one, and three consecutive specialist bi-fold doors to open the marquee up to the ornamental gardens.
A new wiring system was installed which gave access to 13amp and 3 phase sockets built into the boxed legs, plus hidden speaker wiring and audio system.
Full lighting was installed to complement the star cloth ceiling lining. Finally an alarm system provided the required security.
Call on: 01527 821 789
Email: info@fewsmarquees.co.uk
Or fill in an enquiry form
Call 01527 821789 or email info@fews.co.uk
Matt, Molly and Jack are our dedicated account managers with extensive expertise and experience leading event builds. One of them will guide you through every step of the process.
Request a Quote